Quiet hospitality
Propose measurable noise and vibration targets, machinery isolation, electrical loads and service systems. Hybrid propulsion is an option to assess, not an approved specification.
Project K-1 / Bira · Indonesia
An invitation to naval architects who have helped build wooden phinisi alongside a head craftsman. Propose a coordinated design, quantity and supervision engagement for two vessels, each with ten private-balcony guest suites.
This is a non-binding prequalification stage. No appointment, contract, construction start or funding approval is announced.
01 / The design brief
Two sister wooden monohull phinisi for weekly cruising in the Komodo area. The programme calls for four decks, eight twin suites and two master suites, private balconies, and accommodation for an indicative crew of 22–24.
Guest comfort, low noise and vibration, upper-deck weight, and drawings usable by Bira craftspeople must be considered together from the outset.
Provisional working dimensions
The working brief requests a minimum beam of 12.4 m, approx. 45 m hull body and approx. 50 m LOA. These are not approved technical dimensions. The designer must substantiate stability, scantlings, weight, draught and launch feasibility. Any smaller beam or changed programme requires an explicit written variation.
What the design must resolve
Proposals should demonstrate how the team will turn the programme into coordinated, verifiable design outputs.
Propose measurable noise and vibration targets, machinery isolation, electrical loads and service systems. Hybrid propulsion is an option to assess, not an approved specification.
Account for private balconies, upper-deck guest gathering, sky terrace, jacuzzi and tank free-surface effects in the weight ledger and stability work.
Provide coordinated drawings, full-size templates and on-site plotting support that the yard and head craftspeople can use during construction.
02 / Design scope
Offer a complete, itemised professional package. State responsibility, price, delivery period and acceptance evidence for every output, including BOQ and supervision. Disclose exclusions and dependencies.
LOA, LWL, beam, draught and depth, preliminary displacement and estimated gross tonnage.
Four decks: suites, galley, crew spaces, machinery, tanks and tender arrangements.
Lines plan, hydrostatic tables and curves.
Lightship, full-load, upper-deck guest gathering, full jacuzzi and free-surface conditions; identify the calculation signatory.
Keel, frames, planking and deck beams; accepted and excluded species and moisture requirements.
Designer’s proposed NCVS and classification basis, applicable rule editions, submission drawings and authorised signatories. Requirements must be established by the designer; this page does not confirm approval.
Engine, shafting, gearbox, thruster, fuel/water/waste tanks, machinery space and launch draught.
Masts, sail area and transfer of rig loads to the hull.
Yard templates usable by craftspeople, with attendance during plotting.
Material for owner review and coordination with a separately appointed interior designer.
Drawing adaptations and plotting support for the second hull, priced separately.
At least three proposed Bira visits, with exact count and stage milestones, remote drawing responses, head-craftsman coordination, photo/evidence reports and snag closeout. Specify availability, who signs each inspection and whether travel, accommodation, additional visits and second-hull supervision are included.
Written opinion based on a measured shore profile: launch draught, method and launch weight.
After appointment and sufficient design definition, deliver a versioned BOQ linked to drawings and specifications: units, net quantities, allowances/waste assumptions, material/specification references, vessel allocation and revision traceability. Identify who measures, checks and validates yard procurement quantities. Distinguish a quantity schedule from priced supplier quotations, taxes and a guaranteed construction budget.
BOQ and the itemised supervision plan are part of the requested professional package. Submit your scope and fee approach; a new design or BOQ is not requested free of charge before appointment. Interior design remains separately coordinated unless expressly offered.
Engagement target / subject to negotiation
The owner is targeting US$60,000 for the coordinated professional engagement. The allocation between two vessels, taxes, visits and travel basis must be confirmed in the written scope. This is an indicative owner budget, not an agreed supplier price, award or funding commitment.
Itemise each design output, BOQ, first- and second-hull services, signatories, review rounds, visit count, travel, taxes, payment milestones and exclusions. Explain any gap against the indicative target before a contract is considered.
Propose the method, responsibility and design maturity needed for quantities. Quantities and yard allowances are checked against drawings; actual procurement prices and construction budget require separate evidence.
Define the reviewer and acceptance evidence for each deliverable and supervision milestone, including head-craftsman coordination, drawing revisions and unresolved issues. A file upload or completed status is not technical acceptance.
03 / Eligibility & evidence
Provide evidence of the following experience and capability. Prequalification is non-binding; the timetable and contracting arrangements remain subject to confirmation.
04 / Process & assessment
After eligibility checks, proposals are assessed against the published K-1 criteria. Lowest price does not automatically determine selection.
Use one versioned information package for all eligible candidates. Scope or timetable changes will be communicated uniformly.
05 / Proposed timetable
Indicative full-proposal timetable dated 19 October 2026. The current EOI intake status is shown below; later proposal and opening dates remain subject to confirmation.
Proposed EOI and NDA deadline.
Proposed deadline; UTC+8. Confirm before relying on it.
Proposed joint opening and completeness check.
The indicative timetable also proposes questions by 2 November, clarification/presentations on 10–13 November and a written decision in November. The later full-proposal stage, contracting arrangements and any confirmed date changes will be communicated uniformly. EOI prequalification does not commit funding or appoint a designer.
06 / Expression of interest
Submit an expression of interest when the intake status below is open. Include your practice, proposed technical signatory, completed vessel dimensions and evidence of collaboration with a head craftsman.
Use the project intake form below. Named project reviewers receive a private notification; candidate documents are not placed on a public page or automatically emailed back to applicants.
An on-screen receipt confirms storage of your EOI. Email delivery and eligibility are separate and will not be implied by a storage reference. Prequalification is not a tender award or an invitation to begin work.
You can review the scope below. Submit evidence only when this channel opens; confirmed dates or changes will be issued uniformly.
Browsing this page does not submit an EOI.
Project contact / data-use requests
Use this project enquiry channel for scope, dates, the NDA process or a request about your submitted information. A stored reference confirms storage only. No candidate auto-email is sent.
The project operator, named reviewer access and retention notice must be confirmed before public intake opens.
Project enquiry intake is not open.